SANLI M&E ENGINEERING PTE. LTD. is a Local Company in Singapore, UEN 200604459E. Status: Live Company. Registered on 29 Mar 2006.

| Field | Value |
| --- | --- |
| UEN | 200604459E |
| Status | Live Company |
| Entity type | Local Company, Private Company Limited by Shares |
| Registered | 29 Mar 2006 |
| Industry (SSIC) | 41009 Construction of buildings n.e.c. |
| Secondary industry | 77392 Renting of industrial machinery and equipment without operator |
| Address | 22 CHIN BEE DRIVE, Singapore 619870 |
| Officers | 17 |
| Last annual return | 10 Oct 2025 |
| Area | Jurong West, District 22 |
| Nearest station | Lakeside MRT, about 937 m |

## BCA registrations

- GB2 General Builder Class 2, expires 27 Aug 2028 (BCA licensed builder)
- CW02 Civil Engineering, grade C1, expires 1 Oct 2027 (BCA registered contractor)
- ME05 Electrical Engineering, grade L6, expires 1 Oct 2027 (BCA registered contractor)
- ME11 Mechanical Engineering, grade L6, expires 1 Oct 2027 (BCA registered contractor)
- ME02 Building Automation, Industrial & Process Control Systems, grade L5, expires 1 Oct 2027 (BCA registered contractor)
- SY02 Supply workhead SY02, grade L5, expires 1 Oct 2027 (BCA registered contractor)
- SY08 Supply workhead SY08, grade L3, expires 1 Oct 2027 (BCA registered contractor)

## Government contracts

18 GeBIZ awards, SGD 776,163,938 in total (matched by company name). Newest:

- 10 Nov 2025: Development of Changi NEWater Facility 3 (Public Utilities Board, SGD 205,000,000)
- 21 Oct 2025: Supply and Installation of Electrical Services for Cross Island Line Phase 1 and Cross Island Line - Punggol Extension (Land Transport Authority, SGD 281,032,155)
- 7 Oct 2025: Replacement of 2 units of main seawater intake pumps (MSIPs) at Marine Aquaculture Centre (Singapore Food Agency, SGD 333,000)
- 29 Aug 2025: Replacement of Mechanical, Electrical, Instruments, Control and Automation (MEICA) Equipment at Kranji NEWater Factory (KNF) (Public Utilities Board, SGD 6,949,000)
- 9 Jul 2025: Tuas Water Reclamation Plant Contract 3D3 - Domestic Liquids Module 2 - NEWater (Public Utilities Board, SGD 105,300,000)
- 9 Jan 2025: Supply, Installation and Maintenance of Level and Flow Instruments for the Deep Tunnel Sewerage System Phase 2 Project (Public Utilities Board, SGD 9,450,000)
- 20 Dec 2024: Supply and Delivery of Spares to Water Supply (Plants) Installations (Public Utilities Board, SGD 1,837,523)
- 16 Dec 2024: Replacement of Pumpsets and Related Ancillaries at Opera Estate Pumping Station (Public Utilities Board, SGD 3,187,210)
- 13 Nov 2024: Replacement of Mechanical and Electrical Equipment at Kranji Water Reclamation Plant - Contract 3 (Public Utilities Board, SGD 2,258,000)
- 14 Mar 2024: Replacement of Flowmeters at Various Installations in Catchment & Waterways Department (Public Utilities Board, SGD 295,800)

## Related

- Industry: [Construction of buildings n.e.c.](https://getzeroslide.com/industry/41009-construction-of-buildings-n-e-c)
- Building: [Postal code 619870](https://getzeroslide.com/building/619870-singapore-619870)
---
Data date: 16 Sep 2026. Contains information from ACRA Information on Corporate Entities accessed on 2026-10-06 from data.gov.sg, made available under the Singapore Open Data Licence version 1.0.